Sunday, February 22, 2009

Step 2: Design

We met with the contractor this afternoon, who was extremely nice. We discussed what it was that we were wanting in an addition and he had lots to tell us. One major thing that Brent and I did not consider was the peaks of the roof. We have to design it so that the water does not get trapped in a location. I think working with him is going to be wonderful. So, we are now on Step 2 of this process, which is the design process. He is going to make up some drawings for us to look at and see which ones would like and go from there. He said is should only be a few days and we will have something to look at. Exciting!

No comments: